ISC2-CC domain - 10% of the exam

Business Continuity (BC), Disaster Recovery (DR) & Incident Response Concepts

Business Continuity (BC), Disaster Recovery (DR) & Incident Response Concepts is 10% of the ISC2-CC exam. These are the objectives it covers, each with practice questions, with every answer explained.

The domain in numbers

35
Practice questions
3
Objectives
35
Medium

Where people go wrong

  • Swapping the recovery time and recovery point objectives

    The wrong answers hand the recovery point objective the job of the recovery time objective, or the reverse. One option even states the correct pair of ideas with the labels swapped. The recovery time objective caps how long a function may stay unavailable. The recovery point objective caps how much data may be lost, which sets how often copies must be taken. A fifteen-minute figure for data loss is a recovery point, while faster restoration is a recovery time.

    See it in a sample question
  • Treating disaster recovery as the whole of continuity

    The wrong answers treat business continuity and disaster recovery as synonyms, as a reversed hierarchy, or as insurance. Disaster recovery is the narrower technical component. It restores IT systems and data so that the broader continuity plan can keep every critical function running. Continuity covers the whole business and operates alongside recovery from the outset, so it is not a fallback that applies only after recovery has failed.

    See it in a sample question
  • Setting recovery priorities without a business impact analysis

    The wrong answers set recovery order by revenue, by the loudest stakeholder, by installation age, or by buying a solution first. The business impact analysis is the activity that ranks functions by the operational, financial and safety harm of losing them, and it supplies the tolerances behind the targets. It runs before restore testing or a hot site purchase, and a risk assessment looks at threats instead of critical functions.

    See it in a sample question
  • Mismatching the alternate site with the recovery target

    The wrong answers pick a site type that cannot meet the stated timing, or mislabel an empty facility. A cold site has power, network and space but no installed servers or current data, so systems are delivered and configured after a disaster. A warm site holds some hardware and data. A hot site continuously mirrors production and fails over in minutes, so only it fits a one-hour target. Reciprocal agreements guarantee neither capacity nor speed.

    See it in a sample question
  • Placing an incident response action in the wrong phase

    The wrong answers pick a real activity from a different phase. Containment isolates a host to limit spread while preserving it for analysis. Eradication removes malware and compromised accounts, and wiping a machine before containment destroys evidence. Detection and analysis validates an alert and scopes it. Preparation happens before any incident. A lessons-learned review comes after recovery and feeds what should change back into the plan.

    See it in a sample question

Objectives in this domain

What to study

The official documents this domain's practice questions cite most.

Sample questions from this domain

Free sampleBusiness Continuity (BC), Disaster Recovery (DR) & Incident Response Conceptsmedium

A colleague asks how the recovery time objective and the recovery point objective differ in what they measure. Which explanation draws the distinction most accurately?

  • ARTO measures how much data may be lost, while RPO measures how long recovery may take
  • BRTO caps the tolerable outage duration, while RPO caps the tolerable amount of data loss Correct
  • CBoth measure downtime, but RTO applies to hardware and RPO applies to software
  • DRTO and RPO are two names for the same downtime target used by different vendors
RTO bounds acceptable downtime while RPO bounds acceptable data loss, so the two metrics answer different recovery questions. RTO drives how quickly service is restored and RPO drives how current the restored data is; a system can have a tight RTO yet a loose RPO or the reverse.

Why A is wrong: This states the correct pair of ideas but swaps the labels, which is the classic trap; RTO is about time to recover and RPO is about data loss.

Why B is correct: This correctly separates the two axes: RTO is time-to-restore service and RPO is the acceptable data-loss window measured in time.

Why C is wrong: The split by asset type is invented; neither metric is defined by hardware versus software, so this misstates both concepts.

Why D is wrong: Treating them as synonyms is a common beginner error, but they are distinct objectives that can hold very different values for the same system.

Free sampleBusiness Continuity (BC), Disaster Recovery (DR) & Incident Response Conceptsmedium

Two colleagues disagree about how the business continuity plan and the disaster recovery plan relate to each other. Which statement most accurately captures the relationship between them?

  • AThey are interchangeable names for the same document and can be merged without any loss of meaning.
  • BThe disaster recovery plan governs the whole organisation, while the continuity plan covers only the data centre.
  • CThe continuity plan is only needed once the disaster recovery plan has already failed to work.
  • DThe disaster recovery plan focuses on restoring IT systems, and it supports the broader continuity plan that keeps the whole business running. Correct
Disaster recovery restores IT systems as a subset of the broader business continuity plan. Business continuity is the umbrella that keeps critical functions available, and disaster recovery is the technology-focused component nested inside it, so the two are related but not equal in scope.

Why A is wrong: The two plans have different scopes and are not synonyms. It is tempting because both address disruption, but continuity covers the whole business while recovery targets technology.

Why B is wrong: This reverses the scopes. It is tempting because DR is technically detailed, but continuity is the broad plan and recovery is the narrower technical component.

Why C is wrong: Continuity is not a fallback for a failed recovery. It is tempting because both activate during crises, but continuity operates alongside recovery from the outset, not only after failure.

Why D is correct: This is correct because disaster recovery is a subset concerned with technology restoration, feeding into the wider continuity plan that sustains all critical functions.

Free sampleBusiness Continuity (BC), Disaster Recovery (DR) & Incident Response Conceptsmedium

A regional hospital is deciding which services to restore first if its systems fail. The finance team wants the billing portal restored first because it earns revenue, while clinical staff insist the medication-dispensing system must come first. Which principle should guide how the business continuity plan resolves this order?

  • ARestore functions in the order set by the business impact analysis, which ranks them by criticality to the mission Correct
  • BRestore whichever system generates the most revenue per hour, since financial impact is easiest to quantify
  • CRestore systems in the order they were originally installed, giving the oldest infrastructure priority
  • DRestore whichever system the loudest department head demands first, to reduce internal conflict quickly
Recovery sequencing follows the criticality ranking produced by the business impact analysis, not revenue or politics alone. The business impact analysis evaluates each function against the full range of impacts including safety, legal and operational consequences, so its criticality ranking is the objective basis for deciding which systems the continuity plan restores first.

Why A is correct: The business impact analysis ranks functions by their true impact on the organisation's mission, including safety and legal exposure, and that ranking is what the plan uses to sequence recovery.

Why B is wrong: Prioritising by revenue alone is tempting because money is measurable, but a BIA weighs operational, safety and legal impacts too, and patient safety typically outweighs billing income.

Why C is wrong: Installation age has no bearing on how critical a function is to the mission, so it cannot rationally set recovery order.

Why D is wrong: Letting the most vocal stakeholder decide feels expedient, but recovery order must follow the objective criticality established by the BIA rather than internal politics.

Free sampleBusiness Continuity (BC), Disaster Recovery (DR) & Incident Response Conceptsmedium

In a discussion of alternate processing sites, an engineer describes a facility that has power, network and floor space provisioned but no installed servers or current data, so equipment must be delivered and configured before operations resume. Which type of backup site is being described?

  • AA hot site, fully equipped and continuously updated so it can take over almost immediately
  • BA warm site, partially equipped with some hardware and periodically refreshed data
  • CA cold site, providing only the environment so that systems and data are installed after a disaster Correct
  • DA mirrored site, running a real-time duplicate of production at a second location
A cold site offers only the operating environment, so it costs the least but yields the longest recovery time among backup sites. Backup sites trade cost against recovery speed; a cold site is cheapest because nothing is pre-installed, which is why standing up systems and restoring data there extends the outage.

Why A is wrong: A hot site is the opposite extreme, kept ready with running systems and current data, so its fast takeover contradicts the delivery-and-configure delay described.

Why B is wrong: A warm site is a plausible middle answer, but it already holds some hardware and data, whereas the described facility has only the environment and no servers.

Why C is correct: A cold site supplies space, power and connectivity but no ready equipment or data, matching the need to deliver and configure systems before recovery, and giving the longest recovery time.

Why D is wrong: A mirrored site maintains a live synchronised copy, which is even more ready than a hot site and clearly inconsistent with an empty, unequipped space.

Free sampleBusiness Continuity (BC), Disaster Recovery (DR) & Incident Response Conceptsmedium

A junior analyst at Fernwood Logistics notices that a workstation is beaconing to a suspicious external address and appears to be spreading to neighbouring machines on the same subnet. The incident response plan has been activated. Which action best fits the containment phase of incident response?

  • AWipe and rebuild the affected workstation immediately so staff can resume work without delay
  • BIsolate the affected workstation from the network segment to stop the spread while preserving it for analysis Correct
  • CConvene a lessons-learned meeting to document how the malware entered the environment
  • DDraft a public statement for customers explaining that a security incident is under way
Containment aims to stop an incident from spreading while preserving the affected systems for later analysis. Containment sits between detection and eradication; its purpose is to limit the scope and damage of an incident, so isolating an actively spreading host without destroying it is the correct first move.

Why A is wrong: Wiping and rebuilding is an eradication and recovery activity that also destroys forensic evidence; it is tempting because it feels like decisive progress but it skips containment and undermines later analysis.

Why B is correct: Isolating the host limits further damage and lateral movement while keeping the machine intact for investigation, which is precisely the goal of containment before eradication and recovery.

Why C is wrong: A lessons-learned meeting belongs to the post-incident phase after the threat is handled; holding it now leaves the malware actively spreading and confuses the order of the response phases.

Why D is wrong: External communication may be required later under the plan, but it does nothing to stop active spread and is not a containment action; prioritising it now leaves the technical threat unaddressed.