N10-009 - Network Operations (19% of the exam) - Section 3.3

Explain high availability and disaster recovery concepts, including redundancy, failover, backups, and the RPO/RTO recovery metrics.

Explain high-availability designs - first-hop redundancy (FHRP), link aggregation, NIC teaming, and active/active versus active/passive clustering - that eliminate single points of failure. Distinguish the disaster-recovery site types (hot, warm, cold) and the recovery metrics RPO and RTO, and explain how backup strategy and testing satisfy a continuity objective.

High availabilityRedundancy and failoverRPO and RTOHot/warm/cold sites

Practice question for this objective

Free sampleNetwork Operationsmedium

During a business-continuity review, a team must state what distinguishes a warm recovery site from the other site types. Which statement is correct?

  • AIt has hardware and connectivity in place but restores data from recent backups, so recovery falls between a hot and a cold site. Correct
  • BIt provides just conditioned space and power, with servers procured and installed only after a disaster is declared.
  • CIt mirrors production data in near real time so the standby can take over within minutes of any outage.
  • DIt is a portable trailer of equipment driven to the incident location on demand after a disaster strikes.
A warm site keeps hardware and links ready but restores data from backups, giving a recovery time between a hot and a cold site. A warm site pre-stages servers and connectivity but does not replicate data continuously, so a failover still requires restoring the latest backups; this puts its recovery time above a hot site and below a cold site.

Why A is correct: Correct; a warm site is pre-equipped yet not continuously replicated, so data must be restored before cut-over, placing its recovery time between the two extremes.

Why B is wrong: Tempting because a warm site is not fully live, but bare space with no pre-installed equipment describes a cold site rather than a warm one.

Why C is wrong: Tempting because both types hold hardware, but near-real-time mirroring and minute-scale cut-over describe a hot site, not a warm one.

Why D is wrong: Tempting as an alternative recovery option, but a transportable unit is a mobile site and does not define a warm site.

See more N10-009 practice questions, answers explained.

Exam traps in Network Operations

Answers that look right on this material and are not. Each one is a distractor from a different question in the N10-009 bank for this domain.

  • A warm site, because its partially configured hardware can be provisioned and brought online within a day of the failure.

    Why it is wrong: A warm site is a reasonable middle-ground choice, but its partially prepared systems typically take hours to a day to bring up, which overshoots a fifteen-minute RTO.

  • The schedule meets the objective, because a daily backup guarantees that no more than four hours of committed data are lost.

    Why it is wrong: This is tempting if RPO is misread as a fixed guarantee of any backup, but a once-daily backup can leave almost a full day of data unprotected, so it does not meet a four-hour RPO.

  • A cold site delivers the shortest recovery time because it holds no data that must be synchronised before cut-over.

    Why it is wrong: Tempting because a cold site has little to synchronise, but with no hardware or data staged it actually takes the longest to recover, not the shortest.

Examworthy is not affiliated with or endorsed by CompTIA. Original, blueprint-aligned practice material only.